Milestones on the Timeline
Milestones appear in a strip below the main chart — not as horizontal bars.

- Diamonds — black diamonds sit on a horizontal baseline, one per date column
- Labels — the date appears under each diamond; milestone names show as colored mini-diamonds with text
- Same-day stacking — when two or more milestones share a date, they stack vertically under that one column
An item is shown as a milestone (not a bar) when either:
- The task is flagged as a milestone, or
- Planned finish does not extend past the planned start (same-day / zero-duration item)
Milestones align to the task’s planned start on the strip. If a milestone looks offset, check dates on the task form.